Slate & Tile Roofing in Kilkenny
Re-slating a farmhouse in natural slate, matching the tiles on a bungalow, or replacing a run of cracked fibre-cement slates. We match what's on your roof, or tell you straight when it's time for a new one.


Before and after a re-slate: worn old slates out, new natural slate on.
How a Re-Slate Runs
Same order on every roof, whatever's going back on, and no section is left open overnight.
- Scaffold up, with a guard rail at the eaves so nothing comes off onto your path.
- Strip the old roof one section at a time. Sound slates are kept back for repairs.
- Check the timbers while they're open. Anything rotten is shown to you and priced first.
- Membrane and battens, set out to the gauge of the slate or tile going on.
- Slate or tile, laid course by course from the gutter up, nailed or hooked.
- Ridge and flashings: new lead at the chimney and valleys, then the site swept.

Natural slate lasts a lifetime when it's laid right.
Get a Free QuoteSlate or Tile: What's on Your Roof?
Natural Slate
Spanish or Welsh slate, nailed or hooked. The longest-lasting roof you can put on a house, and what most period homes here have.
Fibre-Cement Slate
Lighter and cheaper than natural slate, and on many houses built since the 1980s. Easy to match when a few have cracked.
Concrete Tile
Heavy, hard-wearing interlocking tiles on most bungalows and estate houses. Common profiles kept in stock for repairs.
Clay Tile
Plain tiles or pantiles, laid course by course. Mostly on older outbuildings, extensions and restorations.

Repair or Re-Slate?
A few slipped slates is a repair. Slates slipping all over the roof usually means the nails have rusted through.
At that point a re-slate costs less than chasing them one by one every winter. We go up, take photos and show you which it is before we price anything. The stone houses round Thomastown and Inistioge are mostly natural slate on their first re-slate in a century; estate houses in Kilkenny City and Callan tend to be concrete tile. Wind damage after a storm is covered on our storm damage page.
How long does a re-slate take?
Most houses take a week to ten days, weather allowing. The roof is never left open overnight.
Do I need planning permission to re-roof?
Not usually when you replace like with like. Protected structures and architectural conservation areas, like parts of Kilkenny City, are different, so check with Kilkenny County Council first.
Is the work guaranteed?
Yes. New roofs and re-slates carry a 10-year written guarantee on our workmanship, and repairs carry 12 months.